CM 100 - Fundamentals of Construction Management - Stage 3 - Olallo L. Fernandez
Assessment
Assessment Methods | Analysis of exam, quiz, or homework items linked to specific SLOs |
---|---|
Assessment Description | Embedded essay questions related to specific SLO's were include in exams. |
Learning Outcomes | F. Assess the relationship between the determination of project resources, estimating and scheduling. G. Integrate project estimates and schedules for analysis and control of construction projects. |
Number of Sections | 1 |
Number of Instructors | 1 |
Number of Students | 37 |
Data Analysis
Data Shared With | Instructors of the same course (at CCSF) |
---|---|
Data Sharing Methods | None |
Data Summary | 1. For SLO "F", above, the average score was 80% (B) with 68% of students achieving a score of "B" or above and 73% a score of "C" or above. 2. For SLO "G" , above, the average score was 82% (B) with 62% of students achieving a score of "B" or above and 81% a score of "C" or above. |
Analysis Summary | A majority of the students should a score of 80% or higher. The average score of responses should be 80% or higher. |
Next Steps Planned | N/A |
Learning Outcomes | N/A |
Tentative Future Plans
Term | Fall 2013 |
---|---|
Activities |
|
More Details | Two course SLO's will be selected for evaluation in the Fall 2013 semester. |
SLO Details Storage Location
HARD COPY - In a department filing system (department office)