WELD 144 - Welding Processes - Stage 4 - Willis Beasley

Assessment

Assessment Methods

Direct observation of performances, practical exams, group work

Assessment Description1. Observing students following safety steps in setting up oxy-acetylene equipment for metal cutting operations

2. Observing students putting correct cutting tip on the cutting torch and setting the proper psi gas pressure settings for the acetylene and oxygen gases

3.observing students cutting and beveling 1/2 inch mild carbon steel plate

4. Observing students using hand held angle grinders to grind metal for welding

5. Observing students choose the proper electric arc welding electrode

6.observing students safely set correct welding amperage for 1/2 inch metal

7 Observing students welding the cut 1/2 inch metal pieces together
Learning Outcomes1. Ability of students to safely set-up oxy-acetylene cutting and electric arc welding equipment for use with cutting and welding 1/2 inch carbon steel plate

2. Ability of students to safely use held angle grinders to grind cut metal pieces to prepare for electrode arc welding

3. Ability of students to electric arc weld 1/2 inch mild carbon steel pieces together
Number of SectionsWELD 144
Number of Instructorsone
Number of Students20

Data Analysis

Data Shared With

Faculty and staff from related programs/departments

Data Sharing Methods

I the only instructor for this course.

Data Summary100 %of my students were able to achieve the major learning outcomes
Analysis SummaryGiven the high rate of completion by the students in the welding course and

the 100% outcome attainment, the course is working exceedingly well for the enrolled students.
Next Steps PlannedThis semester, I will include electric arc welding lab improvement projects as part of the overall WELD 144 oxy-acetylene and electric arc welding skill development.
Learning OutcomesWelding students will learn how to use their oxy-acetylene and electric arc welding skills to fabricate and weld actual work shop tables, cutting tables

and an overhead awning structure.

Tentative Future Plans

TermFall 2013
Activities

Revision of outcomes and assessment methods (measurements)

More DetailsI plan to have students safely set-up both the oxy-acetylene cutting equipment and electric arc welding equipment for the cutting and welding of both sheetmetal and structural metal thicknesses.

SLO Details Storage Location

HARD COPY - In my personal filing system (my office)

Back to Department Overview