Implementing Changes
| Course Number | Changes | Change Details | Online Info |
|---|---|---|---|
| AIRC 101 Mohammed Zendehnam |
| Project Sheets have been developed that correspond with the FAA curriculum requirements. | |
| AIRC 104 Tanya Lyles |
| Project Sheets have been developed that correspond with the curriculum requirements. | |
| AIRC 105 Tanya Lyles |
| Project Sheets have been developed that correspond with the FAA curriculum requirements. | |
| AIRC 106 Leland Lo |
| Project Sheets have been developed that correspond with the FAA curriculum requirements. |
Conducting Assessments
| Course Number | Methods | Assessed | Analyzed | Changes Planned | Online Info |
|---|---|---|---|---|---|
| AIRC 101 Mohammed Zendehnam |
| Week of December 17 | After the end of the semester | After the end of the semester | |
| AIRC 104 Tanya Lyles |
| Week of December 17 | After the end of the semester | After the end of the semester | |
| AIRC 105 Tanya Lyles |
| Week of December 17 | After the end of the semester | After the end of the semester | |
| AIRC 106 Leland Lo |
| Week of December 17 | After the end of the semester | After the end of the semester |
View Assessment Details for AIRC | View Assessment Calendar for AIRC
Future Plans
No data